Company | Place | Capacity | Type | Year |
---|---|---|---|---|
REAL ISPAT LTD. | Raipur (C.G.) | 12 MW | WHRB + AFBC | 2006 |
SHRI. BAJRANG POWER | Raipur (C.G.) | 08 MW + 10 MW | WHRB | 2006 |
AGIO PAPER INDUSTRIES | Bilaspur (C.G.) | 04 MW | Bio-Mass | 2007 |
ANKIT METAL & POWER | Bankura (W.B) | 12 MW | WHRB + AFBC | 2007 |
SKS ISPAT LTD. | Raipur (C.G.) | 30 MW | AFBC | 2007 |
SKS ISPAT LTD. | Raipur (C.G.) | 40 MW | AFBC | 2008 |
SHRI. BAJRANG POWER | Raipur (C.G.) | 16 MW | AFBC | 2008 |
GOPAL SPONGE | Raipur (C.G.) | 05 MW | WHRB | 2009 |
SHRI. GANESH METALLIKS | Rourkela | 25 MW | WHRB + AFBC | 2010 |
SHRI. BAJRANG METALLIKS | Raipur (C.G.) | 16 MW | AFBC | 2010 |
RAMESHWARAM STEEL | Raigarh (C.G.) | 10 MW | WHRB + AFBC | 2010 |
S.K. SARAWAGI & CO | Raipur (C.G.) | 05 MW | WHRB | 2011 |
MSP STEEL & POWER | Raigarh (C.G.) | 34 MW | CFBC | 2012 |
ANKIT METAL & POWER | Bankura (W.B) | 08 MW | WHRB | 2012 |
MAA KALI ALLOYS UDYOG | Raigarh (C.G.) | 10 MW | WHRB + AFBC | 2013 |
SHAH SPONGE & POWER | Tata (Jhar) | 15 MW | WHRB + AFBC | 2013 |
BALDEV ALLOYS (P) LTD. | Raipur (C.G.) | 08 MW | WHRB + AFBC | 2013 |
SINE WAVE BIO-MASS | Sangli (Mah) | 10 MW | Bio-Mass | 2013 |
RASHMI METALLIKS LTD. | Kharagpur | 12 MW | WHRB | 2013 |
ANKIT METAL & POWER | Bankura (W.B.) | 25 MW | AFBC | 2013 |
M.S.P. Steel & Power | Raigarh (C.G.) | 12 MW - High Pressure Piping Engineering | ||
Maruti Clean Coal | Korba (C.G.) | 300 MW - Raw Water Piping Engineering | ||
Chhattisgarh State Power Generation Company Limited | Korba (C.G.) | 4 x 210 MW - High Pressure Piping Engineering | ||
Megga Power Projects | Jalore (Raj) | 06 MW - DPR Submitted | ||
Kalinga Metaliks | Keonjhar (Odisha) | 40 MW - DPR Submitted | ||
Jupiter Cement Industries | Sarikela | 20 MW - DPR Submitted | ||
Jupiter Cement Industries | Hazaribagh | 05 MW - DPR Submitted | ||
SKJ Ispat Ltd | Keonjhar (Odisha) | 30 MW - DPR Submitted | ||
Shyam SEL & Shyam Metaliks | Jharsuguda | 12 MW - High Pressure Piping Engineering | ||
Best Food Industries | Karnal (Punjab) | 06 MW - Civil Design & Drawing | ||
ROHIT FERRO TECH LTD (S.K. PATNI GROUP) |
Jajpur (Odisha) | 67.5 MW - Awaited for commissioning. | 2x150TPH CFBC | |
BRAHASPATI IRON & STEEL | Durg (C.G) | 08 MW - DPR Submitted for Pollution & bank Clearance | WHRB | |
CHHATTISGARH DISTELLIARY LIMITED | Kumhari, Durg (C.G.) | 3.5 MW | 35TPH FBC | |
BETUL NON CONVENTIONAL ENERGY | Betul (M.P.) | 10 MW - DPR for Bank Loan Clearance | Bio-Mass (AFBC) | |
GREEN BILT INDUSTRIES LTD | Raipur (C.G.) | Engineering of Autoclave Aerated Concrete Brick Plant | Autoclave Aerated Concrete Plant | |
ROHIT FEERO TECH LTD (S.K. PATNI GROUP) |
Bishnupur (W.B) | 45 MW - DPR submitted at MoEF for Clearance | CFBC | |
ROHIT FEERO TECH LTD (S.K. PATNI GROUP) |
Haldia (W.B) | 45 MW - DPR submitted at MoEF for Clearance | CFBC | |
IMPEX FEERO TECH LTD (S.K. PATNI GROUP) |
Bobbli (A.P.) | 50 MW - DPR submitted at MoEF for clearance | CFBC | |
BIHAR FOUNDRY & CASTINGS LTD. | Ramgarh (Jhar) | 05 MW - Engineering of Captive Power Plant based on 3x11TPH WHRB | WHRB | |
ANSHUL STEEL & POWER | Kolhapur (Mah) | 06 MW - DPR Submitted | WHRB + AFBC | |
SURAJ PRODUCTS LTD. | Rourkela (Odisha) | 01 MW - Feasibility Study of Installation of Power Plant based on Blast Furnace Gases | BF Gas Fired Boiler | |
PETRO CARBON & CHEMICALS PVT. LTD. | Haldia (W.B.) | 2 x 8 MW - Report submitted for Pollution Clearance | WHRB on CPC Gas | |
PRAKASH INDUSTRIES LTD. | Champa (C.G.) | 100 - Electrical Network Audit & Modification Services | ||
CHHATTISGARH STATE INDUSTRIAL DEVELOPMENT CORPORATION (CSIDC). | BILASPUR, RAIPUR & DURG | Study & Submission of Infrastructure Development Report under MIIUS (Contract from Mitcon, Pune) | ||
BHAGWATI STEEL & POWER | Raipur | 12MW - Vacuum Problem trouble Shooting | ||
SHRI. SHYAM ISPAT (P) LTD. | Raigarh | Supervision Services for Erection of 11TPH WHRB Boiler |
Company | Place | Capacity | Type | Year |
---|---|---|---|---|
HOWRAH GASES LTD (MSP GROUP) |
Raniganj (W.B) | 12 MW | AFBC | |
CHAMAN METALLIKS LTD (MSP GROUP) |
Chandrapur (Mah) | 12 MW - Loan Clearance Awaited | AFBC | |
SHIV SHAKTI STEEL | Raigarh (C.G.) | 10 MW - DPR for Bank Loan Clearance | WHRB + AFBC | |
RASHMI ISPAT PVT. LTD. | Jhargram | 08 MW | 04x10TPH WHRB + 20TPH AFBC | |
SUNIL SPONGE LTD. | Raipur (C.G.) | 03 MW - Plant under Erection | 03MW PP based on 20TPH AFBC | |
SIRPUR POWER PVT. LTD. | Mahasamund | 08 MW | Bio-Mass based | |
INDO POWER & STEEL LTD. | Korba (C.G.) | 06 MW - Plant Renovation & Engineering Services | ||
Agarwal Oil Extraction Ltd | Neora (C.G.) | 400kW - Under Engineering | ||
Shree Karthik Paper Ltd | Coimbatore | 03MW - Under Engineering |